Key operational takeaways
- Convert resource-costed tender BOQs into contracts with automatic cost centers in one click—or import multi-level BOQs from Excel.
- Track actual cost at the exact BOQ/plan item level from the originating document (stock issue, cash/bank, invoice, outgoing cheque, sub-IPC) with zero double-counting.
- Separate Daily Site Report quantities, formal Execution Proofs, and billed IPC quantities—converting IPCs into clean Sales/Purchase Invoices while auditing any manual retention override.
- Enforce Technical Office gates (Shop Drawings, Material Submittals, Samples) as Ignore, Warn, or Block per company or per contract, and monitor BAC, CPI, and EAC live.
1. From Tender Estimating to Contract BOQ & Execution Plans
Too often, the technical office prices a tender in Excel, wins the award, and hands off a static sheet while accounting books costs generically at the project level. In Swap+, the Tender Estimate uses the exact same unlimited-depth tree BOQ structure as the contract—separating resource-level unit cost (materials, labor, equipment, subcontractors) from selling price and margin.
Upon award, one click converts the finalized tender into a Contract with its BOQ and automatic cost center. Contracts break down into Phases and prerequisite-linked Plans—blocking accidental over-planning beyond contract quantities while recording real over-execution on site.
- Import multi-level BOQs from Excel with row-level error validation, or copy from a prior contract.
- Manage Variation Orders adding new items or applying price revisions strictly to new quantities.
- Adopt modules progressively: start with Contracts & IPCs, then enable Execution Plans, Subcontracts, and full Technical Office.
2. Technical Office Governance Gates & Three Separate Quantities
Swap+ includes a full Technical Office workspace: Drawings, Shop Drawings, and Submittals with revisions and approval states, RFIs, Transmittals, Material Submittals, Samples, and a unified Technical Office Inbox surfacing every open risk.
Each governance gate—executing without an approved Shop Drawing or requesting materials without an approved Material Submittal or Sample—can be set to Ignore, Warn, or Block at the company level and overridden per contract. Meanwhile, Daily Site Reports auto-aggregate into draft Execution Proofs without double-counting, keeping site-executed, formally certified, and billed IPC quantities clearly separated.
3. Clean-Invoice Client & Subcontractor IPCs + Retention Audit
Client and Subcontractor IPCs (مستخلصات) support Interim, Final, and Closing types with capped retentions, automatic FIFO retention releases, advance-payment recovery, custom GL-mapped deductions, per-line tax selection, and multi-currency exchange rates.
One click converts an IPC into a clean Sales or Purchase Invoice carrying full certified work plus tax—while retentions and advance recoveries settle cleanly at collection or payment so revenue and tax bases remain accurate. If anyone manually adjusts a retention or advance recovery, Swap+ preserves the system-calculated figure alongside the manual entry and flags every difference in the Deduction Variance Audit Report.
4. Single-Source Item-Level Actual Costing & Earned Value (EVM)
Every posted cost document—site stock issue (imported straight from approved Material Issue Requests), cash/bank expense, purchase invoice, outgoing cheque, journal line, or approved subcontractor IPC—links directly to its Execution Plan item. Cost is read strictly from the source document so nothing is ever double-counted, with instant budget overrun alerts.
On the Contracting Dashboard, leadership sees live Contract Value, Certified Progress, Budget at Completion (BAC), Actual Cost, Cost Performance Index (CPI), Estimate at Completion (EAC), and projected profit per contract and across the entire portfolio.